Project Sec

or - how I got there in the end - part 8

 
 

main 1 2 3 4 5 6 7 8 9
Construction Notes
Skirt
The skirt plug was made from 1/2" MDF sheet, each panel being cut to profile and fitted to 3/4" CDX ply top and bottom templates.
 
I cut holes for the hemispheres into each panel before putting the plug together - this made for more accurate positioning of the hemispheres, but proved to be a pain when it came to later stages, including sanding, laying up and painting. (next time...!!)
 
The plug was finished with a 1/16" thickness of P40 filler, sanded to a smooth finish using 600 grit wet & dry, and this was given a coat of G4 sealer which was sanded with 1200 grit wet & dry before being given 6 coats of Carnuba wax and polished to a high shine ready for laying up.
 
The plug was fitted with a divider to allow for a two piece mould, and a flange was created in order to bolt the halves together.
 
The mould was created in the usual manner, with gelcoat, tissue and coarse mat to around 1/8" thickness, but this was found to be a bit flimsy and I had to add MDF strengtheners to the outside of the mould to maintain the correct shape - it was them holes again!
 
The final casts were made in the usual way, with black gelcoat, tissue mat and 6 layers of coarse mat, all using black pigmented resin.
 
On completion and on removal of the pieces from the moulds, the holes for the hemispheres were re-cut and cleaned up.
 
Hemispheres
A 100mm acrylic two piece sphere was used to form the core of the plug, which was profiled with an inner lip for fixing to the inside of the skirt.
 
A fibreglass mould was taken from this plug, and the casts were made using black gelcoat, tissue and two layers of coarse mat, using a black resin mix.
 
There are 56 hemispheres in the completed skirt - (and I only made one mould! - months it took!) - The hemispheres are fixed to the inside of the skirt with black silicone sealant.
 
Hemisphere Rings
The rings are resin castings made from an RTV100 rubber mould.
 
A pattern was turned in 1/2" MDF and mounted on an MDF baseboard. This was surrounded by a 5" plastic drainage pipe to form an outer edge to the mould and 3" plastic pipe to form the inner edge.
 
Again, 56 of these were needed - and these were fixed to the outside of the skirt with black silicone sealant.
 
 
Go to Part 9 - base, mobility & audio
 
Construction Images
 
completed skirt plug
completed moulds
 completed skirt
hemisphere plug
hemisphere ring mould & cast
finished hemisphere and ring
 

© 2009 Copyright MRH